The Carter Lake Uranium Project covers ~ 1113 hectares on the Carter Lake Corridor, an exploration zone adjacent to the Patterson Lake Corridor which hosts two of the most significant recent discoveries in the basin: Nexgen’s Arrow Prospect and Fission’s Patterson Lake South Deposit.
The principal exploration target at Carter Lake is ~ 4.7km of subsurface conductive anomalies, identified in a 2006 MegaTEM survey and a 2008 VTEM survey, both completed by ESO Uranium Corp. The anomalies are interpreted as a conductive horizon at or above the unconformity, which may be indicative of hydrothermal enrichment.